IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0612 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $200 $0 Implemented
NC0444 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $5,257 $2,000 Implemented
NC0444 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,731 $500 Implemented
NC0444 # 04 Y:2012 04 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,902 $4,000 Implemented
NC0444 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $971 Implemented
SF0398 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,251 $0 Implemented
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SF0398 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,241 $0 Implemented
SF0398 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,965 $424 Implemented
SF0398 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,927 $56,209 Implemented
SF0398 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $975 $2,405 Implemented
OK0804 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,796 $56,474 Implemented
OK0804 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,362 $750 Implemented
MZ0061 # 01 Y:2010 01 2010 USE OPTIMUM THICKNESS INSULATION $145 $300 Implemented
MZ0061 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $79 $1,200 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented
MZ0061 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,019 $0 Implemented
MZ0061 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,184 $0 Implemented
MZ0061 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,160 $3,680 Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MZ0061 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,994 $5,000 Implemented
TT0053 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,700 $10,500 Implemented
TT0053 # 03 Y:2010 03 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,000 $10 Implemented
TT0053 # 04 Y:2010 04 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,700 $1,000 Implemented
BD0366 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $9,620 $210 Implemented