IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

280

matching recommendations
Reset
NAICS 31199 All Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0706 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,579 $1,500 Implemented
OK0706 # 02 Y:2005 02 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,672 $13,451 Implemented
AS0389 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,163 $1,698 Implemented
AS0389 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,971 $7,343 Implemented
AS0378 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,302 $480 Implemented
AS0378 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,081 $499 Implemented
AS0378 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,918 $12,008 Implemented
AS0378 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,906 $6,178 Implemented
UM0245 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,060 $12,288 Implemented
UM0245 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $225 Implemented
GT0773 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $2,232 $4,550 Implemented
GT0773 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $2,600 $0 Implemented
GT0773 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,860 $2,500 Implemented
GT0773 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,845 $6,250 Implemented
GT0773 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,743 $11,070 Implemented
AM0439 # 01 Y:2003 01 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $910,000 $435,000 Implemented
AM0439 # 02 Y:2003 02 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,200 $1,200 Implemented
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AM0439 # 04 Y:2003 04 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,700 $270 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented