IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0792 # 01 Y:2004 01 2004 REPAIR AND ELIMINATE STEAM LEAKS $21,335 $10,000 Implemented
GT0792 # 02 Y:2004 02 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,495 $3,060 Implemented
GT0792 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,050 $616 Implemented
GT0792 # 04 Y:2004 04 2004 REPAIR OR REPLACE STEAM TRAPS $9,228 $11,000 Implemented
NC0298 # 01 Y:2004 01 2004 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $9,750 $0 Implemented
NC0298 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $1,163 $800 Implemented
NC0298 # 04 Y:2004 04 2004 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,175 $1,200 Implemented
NC0298 # 06 Y:2004 06 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $1,388 $900 Implemented
NC0298 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,037 $1,335 Implemented
NC0298 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $219 $100 Implemented
NC0295 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $100 Implemented
NC0295 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,285 $3,200 Implemented
UM0255 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $10,323 $6,486 Implemented
UM0255 # 02 Y:2004 02 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,279 $2,497 Implemented
UM0255 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,618 $2,500 Implemented
MI0077 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,344 $100 Implemented
MI0077 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $10,968 $5,200 Implemented
MI0077 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $1,200 Implemented
MI0077 # 06 Y:2004 06 2004 CONDENSE OPERATION INTO ONE BUILDING $44,015 $3,220 Implemented
NC0272 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,803 Implemented
NC0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,885 $610 Implemented
NC0272 # 03 Y:2003 03 2003 RECOVER AND REUSE WASTE MATERIAL $990 $400 Implemented
NC0272 # 04 Y:2003 04 2003 USE PHOTOCELL CONTROLS $167 $235 Implemented
NC0264 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $454 $630 Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented