IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

449

matching recommendations
Reset
NAICS 3211 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0311 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $158 Implemented
TA0090 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $120 Implemented
SU0202 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,315 $0 Implemented
SU0202 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,691 $150 Implemented
SU0202 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $500 Implemented
SU0202 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $5,577 $30,560 Implemented
SF0297 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,571 $0 Implemented
SF0297 # 04 Y:2005 04 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $34,144 $50,073 Implemented
OR0471 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $4,840 Implemented
OR0471 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $22,560 $8,500 Implemented
OR0471 # 03 Y:2004 03 2004 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,600 $7,100 Implemented
OR0471 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $58,650 $10,000 Implemented
OR0471 # 09 Y:2004 09 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $6,000 $1,000 Implemented
OR0471 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,291 $27,750 Implemented
MS0262 # 02 Y:2004 02 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,412 $1,518 Implemented
MS0262 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,422 $20,370 Implemented
MS0262 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,889 $406 Implemented
MS0262 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $918 $2,125 Implemented
MS0262 # 09 Y:2004 09 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $815 $444 Implemented
UF0343 # 01 Y:2004 01 2004 REPAIR AND ELIMINATE STEAM LEAKS $10,952 $225 Implemented
UF0343 # 03 Y:2004 03 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,420 $0 Implemented
UF0343 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,592 $1,706 Implemented
UF0343 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $172,708 $330,000 Implemented
UF0343 # 06 Y:2004 06 2004 INSTALL BACK-UP EQUIPMENT $26,182 $64,000 Implemented
UF0343 # 08 Y:2004 08 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $12,000 Implemented