Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
449
matching recommendationsNAICS | 32111 | Sawmills and Wood Preservation |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0311 # 12 Y:2005 | 12 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $480 | $158 | Implemented |
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
SU0202 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,315 | $0 | Implemented |
SU0202 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,691 | $150 | Implemented |
SU0202 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,644 | $500 | Implemented |
SU0202 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,577 | $30,560 | Implemented |
SF0297 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,571 | $0 | Implemented |
SF0297 # 04 Y:2005 | 04 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $34,144 | $50,073 | Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |
OR0471 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $58,650 | $10,000 | Implemented |
OR0471 # 09 Y:2004 | 09 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $6,000 | $1,000 | Implemented |
OR0471 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,291 | $27,750 | Implemented |
MS0262 # 02 Y:2004 | 02 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,412 | $1,518 | Implemented |
MS0262 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,422 | $20,370 | Implemented |
MS0262 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,889 | $406 | Implemented |
MS0262 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $918 | $2,125 | Implemented |
MS0262 # 09 Y:2004 | 09 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $815 | $444 | Implemented |
UF0343 # 01 Y:2004 | 01 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $10,952 | $225 | Implemented |
UF0343 # 03 Y:2004 | 03 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,420 | $0 | Implemented |
UF0343 # 04 Y:2004 | 04 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $4,592 | $1,706 | Implemented |
UF0343 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $172,708 | $330,000 | Implemented |
UF0343 # 06 Y:2004 | 06 | 2004 | INSTALL BACK-UP EQUIPMENT | $26,182 | $64,000 | Implemented |
UF0343 # 08 Y:2004 | 08 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,200 | $12,000 | Implemented |