IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
NAICS 32199 All Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0807 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $558 $470 Implemented
UA0211 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,196 $150 Implemented
UA0211 # 07 Y:2019 07 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $374,108 $1,310,277 Implemented
UA0203 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $567 $486 Implemented
UA0203 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,597 $23,433 Implemented
UA0203 # 02 Y:2019 02 2019 USE PHOTOCELL CONTROLS $1,777 $7,719 Implemented
UA0203 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,053 $200 Implemented
UA0203 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $3,682 $2,568 Implemented
UA0203 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,238 $2,765 Implemented
UU0135 # 04 Y:2018 04 2018 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,749 $900 Implemented
UU0135 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $993 Implemented
AM0750 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $6 Implemented
AM0750 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,760 $1,500 Implemented
AM0750 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $6,550 $9,100 Implemented
AM0750 # 08 Y:2018 08 2018 PAY UTILITY BILLS ON TIME $344 $0 Implemented
AM0750 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,550 Implemented
OR0699 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,314 $3,982 Implemented
OR0699 # 01 Y:2018 01 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,167 $1,495 Implemented
OR0699 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $6,151 $23,153 Implemented
WV0557 # 05 Y:2018 05 2018 UPGRADE CONTROLS ON COMPRESSORS $14,479 $27,450 Implemented
WV0557 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $43,281 $33,600 Implemented
WV0557 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $508 $2,480 Implemented
WV0557 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $65,760 $117,200 Implemented
WV0557 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $13,930 $2,320 Implemented
BS0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $2,653 Implemented