Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
259
matching recommendationsNAICS | 32412 | Asphalt Paving, Roofing, and Saturated Materials Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0488 # 04 Y:2020 | 04 | 2020 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,344 | $36 | Implemented |
AS0488 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,864 | $7,653 | Implemented |
SF0545 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $238,757 | $1,300,334 | Implemented |
SF0545 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $1,151 | $1,194 | Implemented |
SF0545 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,924 | $11,386 | Implemented |
CL1912 # 04 Y:2019 | 04 | 2019 | PAY UTILITY BILLS ON TIME | $103 | $0 | Implemented |
CL1912 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $5,433 | $15,806 | Implemented |
CL1912 # 02 Y:2019 | 02 | 2019 | MINIMIZE WATER USAGE | $1,166 | $1,750 | Implemented |
CL1912 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $4,162 | Implemented |
OR0715 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $948 | $0 | Implemented |
OR0715 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,204 | $0 | Implemented |
UF0523 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,925 | $1,308 | Implemented |
UF0523 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,991 | $4,959 | Implemented |
UF0523 # 04 Y:2019 | 04 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $14,533 | $1,600 | Implemented |
OK1002 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,400 | $2,933 | Implemented |
OK1002 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,343 | $2,609 | Implemented |
OK1002 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,768 | $3,646 | Implemented |
OK1002 # 06 Y:2019 | 06 | 2019 | INSTALL SET-BACK TIMERS | $1,083 | $802 | Implemented |
OK1001 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $3,509 | Implemented |
OR0713 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,959 | $10,959 | Implemented |
OR0713 # 05 Y:2018 | 05 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,108 | $5,028 | Implemented |
OR0713 # 04 Y:2018 | 04 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $7,018 | $26,371 | Implemented |
OR0713 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,594 | $4,336 | Implemented |
OR0713 # 06 Y:2018 | 06 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $929 | $0 | Implemented |
OR0703 # 02 Y:2018 | 02 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,797 | $13,333 | Implemented |