Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
465
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0608 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,575 | $2,925 | Implemented |
MA0608 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $712 | $1,500 | Implemented |
AS0430 # 02 Y:2006 | 02 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,545 | $7,500 | Implemented |
AS0430 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $3 | $1,077 | Implemented |
AS0430 # 04 Y:2006 | 04 | 2006 | INSTALL SKYLIGHTS | $782 | $4,400 | Implemented |
UF0380 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $388,094 | $48,067 | Implemented |
UF0380 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,780 | $2,688 | Implemented |
UF0380 # 07 Y:2006 | 07 | 2006 | ELIMINATE A BY-PRODUCT | $703 | $160 | Implemented |
MS0296 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $57,344 | $3,269 | Implemented |
MS0296 # 03 Y:2006 | 03 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $33,575 | $374 | Implemented |
MS0296 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,082 | $6,420 | Implemented |
GT0822 # 01 Y:2006 | 01 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,995 | $640 | Implemented |
GT0822 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $97,628 | $18,865 | Implemented |
GT0822 # 07 Y:2006 | 07 | 2006 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $450,000 | $20,000 | Implemented |
WV0338 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $24,000 | $10,954 | Implemented |
WV0338 # 03 Y:2006 | 03 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,026 | $0 | Implemented |
WV0338 # 04 Y:2006 | 04 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,133 | $1,000 | Implemented |
WV0338 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,593 | $0 | Implemented |
WV0338 # 06 Y:2006 | 06 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,611 | $45 | Implemented |
WV0338 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,505 | $709 | Implemented |
WV0338 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,078 | $8 | Implemented |
WV0338 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,289 | $820 | Implemented |
WV0338 # 11 Y:2006 | 11 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,129 | $590 | Implemented |
WV0338 # 12 Y:2006 | 12 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,013 | $210 | Implemented |