IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0160 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,719 $74,400 Implemented
MZ0160 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,300 $5,000 Implemented
MZ0159 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $428 $1,200 Implemented
MZ0159 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,973 $1,599 Implemented
MZ0159 # 04 Y:2014 04 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,895 $37,500 Implemented
MZ0159 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $23,000 Implemented
WV0493 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,643 $15 Implemented
WV0493 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $3,507 $1,251 Implemented
WV0493 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $7,244 Implemented
WV0493 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $5,218 $10,000 Implemented
WV0493 # 04 Y:2014 04 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,786 $1,000 Implemented
WV0493 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,848 $509 Implemented
WV0493 # 02 Y:2014 02 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,168 $5,300 Implemented
WV0493 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,956 $44,486 Implemented
DL0128 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,000 $150,000 Implemented
DL0128 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,150 $101,600 Implemented
DL0128 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $18,200 $12,560 Implemented
DL0128 # 05 Y:2014 05 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,000 $20,000 Implemented
DL0126 # 01 Y:2014 01 2014 ADOPT IN-HOUSE MATERIAL GENERATION $283,400 $116,500 Implemented
DL0126 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,400 $7,400 Implemented
DL0118 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,500 $349,314 Implemented
DL0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,300 $3,000 Implemented
DL0118 # 06 Y:2013 06 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,500 $0 Implemented
DL0118 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,504 $20,000 Implemented
DL0118 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $3,600 $1,000 Implemented