IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 32561 Soap and Cleaning Compound Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0433 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,619 $3,573 Implemented
BD0433 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $3,381 $4,425 Implemented
BD0433 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,418 $2,940 Implemented
BD0433 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,387 $20 Implemented
BD0433 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $411 Implemented
LE0347 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,060 $40 Implemented
LE0347 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,654 $1,000 Implemented
LE0347 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $653 $2,000 Implemented
LE0347 # 05 Y:2012 05 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,309 $20,000 Implemented
LE0347 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,156 $16,300 Implemented
LE0347 # 08 Y:2012 08 2012 REPAIR AND ELIMINATE STEAM LEAKS $475 $675 Implemented
LE0322 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,515 $1,000 Implemented
LE0322 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,000 $8,500 Implemented
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented
UD0832 # 02 Y:2011 02 2011 DISCONNECT BALLASTS $2,570 $250 Implemented
UD0832 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,977 $1,063 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 06 Y:2011 06 2011 UPGRADE OBSOLETE EQUIPMENT $4,243 $4,728 Implemented
UD0832 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $500 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
DL0018 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $425,000 $120,000 Implemented
DL0018 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $207,000 $250,000 Implemented
DL0018 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $188,000 $108,000 Implemented
DL0018 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $166,310 $35,000 Implemented
DL0018 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,300 $183,000 Implemented