Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsNAICS | 32561 | Soap and Cleaning Compound Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0433 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,619 | $3,573 | Implemented |
BD0433 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $3,381 | $4,425 | Implemented |
BD0433 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,418 | $2,940 | Implemented |
BD0433 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,387 | $20 | Implemented |
BD0433 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $219 | $411 | Implemented |
LE0347 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,060 | $40 | Implemented |
LE0347 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,654 | $1,000 | Implemented |
LE0347 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $653 | $2,000 | Implemented |
LE0347 # 05 Y:2012 | 05 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,309 | $20,000 | Implemented |
LE0347 # 06 Y:2012 | 06 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,156 | $16,300 | Implemented |
LE0347 # 08 Y:2012 | 08 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $475 | $675 | Implemented |
LE0322 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,515 | $1,000 | Implemented |
LE0322 # 02 Y:2011 | 02 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,000 | $8,500 | Implemented |
UD0832 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,751 | $40,000 | Implemented |
UD0832 # 02 Y:2011 | 02 | 2011 | DISCONNECT BALLASTS | $2,570 | $250 | Implemented |
UD0832 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,977 | $1,063 | Implemented |
UD0832 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,419 | $39,141 | Implemented |
UD0832 # 06 Y:2011 | 06 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $4,243 | $4,728 | Implemented |
UD0832 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $986 | $500 | Implemented |
UD0832 # 08 Y:2011 | 08 | 2011 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $5,424 | $500 | Implemented |
DL0018 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $425,000 | $120,000 | Implemented |
DL0018 # 02 Y:2008 | 02 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $207,000 | $250,000 | Implemented |
DL0018 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $188,000 | $108,000 | Implemented |
DL0018 # 04 Y:2008 | 04 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $166,310 | $35,000 | Implemented |
DL0018 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,300 | $183,000 | Implemented |