IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,572

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0863 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $13,284 $0 Implemented
UD0863 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $10,008 $2,600 Implemented
UD0863 # 13 Y:2012 13 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $43,532 $0 Implemented
BS0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $272 Implemented
BS0004 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,756 $802 Implemented
BS0004 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,840 $34 Implemented
OR0585 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $2,305 Implemented
OR0585 # 11 Y:2012 11 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,086 $16,390 Implemented
MI0229 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $69,199 $111,000 Implemented
MI0229 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $26,164 $22,464 Implemented
MI0229 # 06 Y:2012 06 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,915 $80 Implemented
MI0229 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,865 $1,660 Implemented
MI0229 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,849 $80 Implemented
MI0229 # 09 Y:2012 09 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,382 $385 Implemented
MI0229 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $2,325 $480 Implemented
MI0229 # 11 Y:2012 11 2012 INSTALL SKYLIGHTS $2,117 $3,000 Implemented
MI0229 # 12 Y:2012 12 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,297 $460 Implemented
MI0229 # 13 Y:2012 13 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $624 $1,852 Implemented
UA0085 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $164,656 $57,024 Implemented
UA0085 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $151,364 $35,390 Implemented
UA0085 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $58,443 $1,920 Implemented
AM0615 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,924 $900 Implemented
AM0615 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,856 $27,318 Implemented
AM0615 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $13,704 $10,754 Implemented
AM0615 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,200 $273 Implemented