IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0262 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $4,646 $3,879 Implemented
TT0262 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,023 $2,762 Implemented
TT0232 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $22,260 $107,529 Implemented
TT0203 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,480 $4,250 Implemented
TT0203 # 01 Y:2018 01 2018 COMBINE UTILITY METERS $273,385 $25,000 Implemented
TT0203 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,897 $23,022 Implemented
TT0185 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $173,199 $5,000 Implemented
TT0185 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $114,605 $150,000 Implemented
TT0185 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,276 $1,250 Implemented
TT0185 # 05 Y:2017 05 2017 APPLY FOR INVESTMENT INCENTIVES $2,174 $40 Implemented
TT0185 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,425 $1,425 Implemented
TT0155 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $8,513 $625 Implemented
TT0155 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,646 $40,000 Implemented
TT0155 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,382 $3,000 Implemented
TT0155 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $35,244 $50 Implemented
TT0155 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,106 $30,000 Implemented
TT0136 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,283 $3,073 Implemented
TT0136 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,714 $28,054 Implemented
TT0136 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48 $138 Implemented
TT0123 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,590 $6,000 Implemented
TT0123 # 09 Y:2013 09 2013 APPLY FOR INVESTMENT INCENTIVES $305 $0 Implemented
TT0123 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $862 $50 Implemented
TT0123 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,774 $500 Implemented
TT0121 # 07 Y:2013 07 2013 UPGRADE CONTROLS ON COMPRESSORS $464 $800 Implemented
TT0121 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,685 $8,460 Implemented