IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1017 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,500 $0 Implemented
UD1017 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,662 $17,500 Implemented
UD1017 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,892 $0 Implemented
UD1017 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $2,299 $0 Implemented
CW0113 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $941 $105 Implemented
CW0113 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $1,600 Implemented
CW0113 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,683 $10,280 Implemented
CW0113 # 01 Y:2020 01 2020 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,565 $1,858 Implemented
WV0578 # 10 Y:2019 10 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $221 Implemented
WV0578 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,104 $3,500 Implemented
WV0578 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $5,469 $692 Implemented
WV0578 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,217 $46 Implemented
WV0566 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $50 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $1,217 $3,150 Implemented
WV0566 # 10 Y:2018 10 2018 INSULATE BARE EQUIPMENT $114 $180 Implemented
WV0566 # 02 Y:2018 02 2018 DEVELOP A REPAIR/REPLACE POLICY $4,621 $945 Implemented
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented
WV0563 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $20,002 $754 Implemented
WV0563 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $1,202 $1,400 Implemented
WV0563 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $264 $235 Implemented
UD0971 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $972 $50 Implemented
UD0971 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,580 $0 Implemented
WV0545 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $7,127 $2,800 Implemented