IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0156 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,033 $30 Implemented
MI0156 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,688 $1,074 Implemented
MI0156 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,674 $1,232 Implemented
UW0002 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $252 Implemented
UW0002 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $153 $200 Implemented
UW0002 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $5,998 $2,692 Implemented
UW0002 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,000 $9,385 Implemented
IA0407 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,719 $38,791 Implemented
IA0407 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,657 $4,543 Implemented
IA0407 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,366 $1,000 Implemented
IA0407 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,084 $12,025 Implemented
IA0407 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,098 $4,794 Implemented
MA0618 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,125 $3,552 Implemented
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
MA0618 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $4,906 $18,500 Implemented
MA0618 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $7,795 $1,924 Implemented
MA0618 # 05 Y:2007 05 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,589 $17,740 Implemented
MA0618 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,204 $29,875 Implemented
MA0618 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,316 $3,220 Implemented
MA0618 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,820 $26,621 Implemented
MA0618 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,879 $79,554 Implemented
LL0272 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $58,782 $19,636 Implemented
SU0254 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,902 $0 Implemented
SU0254 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,048 $381 Implemented
SU0254 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $440 $69 Implemented