Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsNAICS | 327212 | Other Pressed and Blown Glass and Glassware Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0641 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,189 | $70,634 | Implemented |
WV0612 # 06 Y:2021 | 06 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,641 | $4,320 | Implemented |
WV0612 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,446 | $16,700 | Implemented |
WV0612 # 10 Y:2021 | 10 | 2021 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $701 | $397 | Implemented |
WV0612 # 11 Y:2021 | 11 | 2021 | INSTALL SET-BACK TIMERS | $611 | $1,110 | Implemented |
WV0612 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,008 | $8,132 | Implemented |
MZ0250 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,697 | $0 | Implemented |
MZ0250 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,786 | $280 | Implemented |
MZ0250 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,351 | $5,600 | Implemented |
WV0547 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $15,992 | $5,658 | Implemented |
WV0547 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $412 | $2,050 | Implemented |
WV0547 # 06 Y:2017 | 06 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $970 | $4,600 | Implemented |
WV0547 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,491 | $9,434 | Implemented |
WV0547 # 09 Y:2017 | 09 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $243 | $1,000 | Implemented |
WV0547 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $175 | $850 | Implemented |
NC0556 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $59,808 | $90,000 | Implemented |
NC0556 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $578 | $868 | Implemented |
NC0556 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,584 | $8,350 | Implemented |
NC0556 # 05 Y:2015 | 05 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,836 | $4,256 | Implemented |
NC0556 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,438 | $12,000 | Implemented |
LE0396 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $1,000 | Implemented |
LE0396 # 05 Y:2015 | 05 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,534 | $1,644 | Implemented |
LE0396 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $214 | $105 | Implemented |
LE0396 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,080 | $2,845 | Implemented |
LE0396 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $35 | Implemented |