IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 3273 Cement and Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0215 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $488 Implemented
SU0215 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $1,814 $1,000 Implemented
SU0215 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,078 $579 Implemented
MS0275 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,870 $34,746 Implemented
MS0275 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,066 $392 Implemented
MS0275 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $7,356 $3,025 Implemented
MS0275 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $9,612 Implemented
UF0355 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,486 $80,890 Implemented
UF0355 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,072 $93,200 Implemented
UF0355 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,438 $478 Implemented
UF0355 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,000 $23,755 Implemented
UF0355 # 06 Y:2005 06 2005 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $12,491 $50,000 Implemented
UF0355 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $625 $3,496 Implemented
UU0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,465 $405 Implemented
UU0078 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,890 $4,820 Implemented
UU0078 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,970 $400 Implemented
UU0078 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $810 $450 Implemented
TA0080 # 01 Y:2004 01 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $67,776 $13,000 Implemented
TA0080 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,160 $585 Implemented
TA0080 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,900 $875 Implemented
TA0080 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,990 $1,600 Implemented
TA0080 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,000 $1,000 Implemented
WV0284 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,486 $300 Implemented
WV0284 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $3,396 $250 Implemented
WV0284 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $0 Implemented