IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 327310 Cement Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0571 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,526 $55,952 Implemented
AS0571 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $22,882 $38 Implemented
AS0571 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,525 $34,427 Implemented
AS0571 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,292 $908 Implemented
AS0571 # 06 Y:2024 06 2024 USE POWER DURING OFF-PEAK PERIODS $492 $511 Implemented
UF0582 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,793 $79,204 Implemented
UF0582 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,408 $756 Implemented
UF0582 # 10 Y:2022 10 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $16,853 $7,275 Implemented
UF0582 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $226,296 $102,253 Implemented
UF0582 # 12 Y:2022 12 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $333,010 $0 Implemented
UU0159 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,476 $12,000 Implemented
UU0159 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $47,066 $8,500 Implemented
UA0124 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,346 $7,195 Implemented
UA3026 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,047 $800 Implemented
UA3026 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,524 $800 Implemented
UA3026 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,585 $18,890 Implemented
UA3026 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,558 $27,390 Implemented
AM0593 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,860 $364 Implemented
AM0593 # 05 Y:2011 05 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,260 $500 Implemented
AM0593 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,600 $6,900 Implemented
AM0593 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,900 $1,000 Implemented
UW0042 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,225 $81,585 Implemented
UA0051 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,840 $10,000 Implemented
UA0051 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,427 $4,500 Implemented
UA0051 # 05 Y:2010 05 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,177 $5,219 Implemented