IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 327992 Ground or Treated Mineral and Earth Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented
GT0927 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,382 $27,983 Implemented
GT0927 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $32,534 $4,145 Implemented
GT0927 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,930 $2,500 Implemented
SU0463 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,966 $4,800 Implemented
UU0134 # 05 Y:2018 05 2018 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,549 $0 Implemented
LE0435 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,469 $1,000 Implemented
LE0435 # 05 Y:2017 05 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,092 $23,000 Implemented
LE0435 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $20 Implemented
NC0563 # 03 Y:2016 03 2016 DEVELOP A REPAIR/REPLACE POLICY $3,304 $7,184 Implemented
NC0563 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $200 Implemented
NC0414 # 02 Y:2010 02 2010 DEVELOP A REPAIR/REPLACE POLICY $1,188 $1,991 Implemented
NC0414 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,335 $50 Implemented
NC0414 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $100 Implemented
NC0414 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $1,692 Implemented
NC0414 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $562 Implemented
NC0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $1,450 Implemented
NC0414 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $268 $499 Implemented
AM0424 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $200 Implemented
AM0424 # 07 Y:2003 07 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,520 $860 Implemented
AM0424 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
AM0424 # 01 Y:2003 01 2003 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $111,100 $8,000 Implemented
AM0424 # 04 Y:2003 04 2003 KEEP BOILER TUBES CLEAN $5,720 $500 Implemented
AM0424 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $23,000 $11,000 Implemented
AM0424 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $55,000 $730 Implemented