IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0476 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,148 $0 Implemented
WI0476 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,557 $4,280 Implemented
UD0702 # 03 Y:2004 03 2004 $25,611 $10,795 Implemented
UD0702 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,625 $0 Implemented
UD0702 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,961 $92 Implemented
UD0702 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $114 Implemented
LE0194 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $866,040 $200,000 Implemented
LE0194 # 02 Y:2004 02 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,658 $12,500 Implemented
LE0194 # 06 Y:2004 06 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,196 $4,000 Implemented
LE0194 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,787 $750 Implemented
UD0700 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,353 $82,536 Implemented
UD0700 # 16 Y:2004 16 2004 UPGRADE CONTROLS ON COMPRESSORS $588 $500 Implemented
WI0475 # 02 Y:2004 02 2004 COVER OPEN TANKS $18,376 $1,000 Implemented
WI0475 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,417 $33,120 Implemented
WI0475 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,127 $1,976 Implemented
WI0475 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,987 $1,920 Implemented
WI0475 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $80 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
IC0086 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,538 $0 Implemented
LM0080 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,164 $300 Implemented