IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 33122 Rolling and Drawing of Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0406 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,691 $65,000 Implemented
LE0406 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,858 $8,310 Implemented
LE0406 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,582 $1,000 Implemented
LE0406 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $300 Implemented
LE0406 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LE0390 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,479 $25,500 Implemented
LE0332 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,829 $40 Implemented
LE0332 # 07 Y:2012 07 2012 DEVELOP STANDARD OPERATING PROCEDURES $6,689 $0 Implemented
LE0283 # 23 Y:2009 23 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,799 $32,466 Implemented
LE0283 # 24 Y:2009 24 2009 INSTALL OCCUPANCY SENSORS $550 $600 Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented
LE0283 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,658 $1,672 Implemented
LE0283 # 03 Y:2009 03 2009 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $38,523 $560 Implemented
LE0283 # 02 Y:2009 02 2009 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $46,426 $38,000 Implemented
WV0308 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,329 $0 Implemented
WV0308 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,364 $3,520 Implemented
WV0308 # 03 Y:2005 03 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,526 $714 Implemented
WV0308 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $2,037 $124 Implemented
WV0308 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,350 $72 Implemented
WV0308 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,560 $110 Implemented
WV0308 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $4,132 Implemented
LE0165 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $468 $0 Implemented
LE0165 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $8,970 $1,440 Implemented
LE0154 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,519 $3,000 Implemented