Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0406 # 07 Y:2015 | 07 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,691 | $65,000 | Implemented |
LE0406 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $6,858 | $8,310 | Implemented |
LE0406 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,582 | $1,000 | Implemented |
LE0406 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,001 | $300 | Implemented |
LE0406 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LE0390 # 06 Y:2015 | 06 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,479 | $25,500 | Implemented |
LE0332 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,829 | $40 | Implemented |
LE0332 # 07 Y:2012 | 07 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $6,689 | $0 | Implemented |
LE0283 # 23 Y:2009 | 23 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,799 | $32,466 | Implemented |
LE0283 # 24 Y:2009 | 24 | 2009 | INSTALL OCCUPANCY SENSORS | $550 | $600 | Implemented |
LE0283 # 12 Y:2009 | 12 | 2009 | COVER OPEN TANKS | $9,339 | $10,000 | Implemented |
LE0283 # 11 Y:2009 | 11 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $18,031 | $30,000 | Implemented |
LE0283 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,658 | $1,672 | Implemented |
LE0283 # 03 Y:2009 | 03 | 2009 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $38,523 | $560 | Implemented |
LE0283 # 02 Y:2009 | 02 | 2009 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $46,426 | $38,000 | Implemented |
WV0308 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,329 | $0 | Implemented |
WV0308 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,364 | $3,520 | Implemented |
WV0308 # 03 Y:2005 | 03 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,526 | $714 | Implemented |
WV0308 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $2,037 | $124 | Implemented |
WV0308 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,350 | $72 | Implemented |
WV0308 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,560 | $110 | Implemented |
WV0308 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,156 | $4,132 | Implemented |
LE0165 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $468 | $0 | Implemented |
LE0165 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $8,970 | $1,440 | Implemented |
LE0154 # 03 Y:2003 | 03 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $3,519 | $3,000 | Implemented |