Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
332
matching recommendationsNAICS | 3313 | Alumina and Aluminum Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0848 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,088 | $0 | Implemented |
UA0016 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60,322 | $10,000 | Implemented |
UD0774 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $94,656 | $6,000 | Implemented |
UD0774 # 03 Y:2008 | 03 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $83,440 | $5,000 | Implemented |
UD0774 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,705 | $3,275 | Implemented |
UD0774 # 06 Y:2008 | 06 | 2008 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $9,454 | $0 | Implemented |
UD0774 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $2,250 | Implemented |
UD0774 # 11 Y:2008 | 11 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,078 | $0 | Implemented |
UD0766 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,420 | $279,770 | Implemented |
UD0766 # 07 Y:2007 | 07 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $40,000 | $1,100 | Implemented |
UD0766 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,800 | $20,000 | Implemented |
UD0766 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,343 | $85,140 | Implemented |
UD0766 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,564 | $19,275 | Implemented |
UD0766 # 14 Y:2007 | 14 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,115 | $0 | Implemented |
LE0261 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,461 | $20 | Implemented |
LE0261 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $100 | Implemented |
LE0261 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,155 | $1,500 | Implemented |
LE0261 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,476 | $150 | Implemented |
TT0005 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $4,816 | Implemented |
TT0005 # 05 Y:2007 | 05 | 2007 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,002 | $200 | Implemented |
TT0005 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $62,060 | $50,000 | Implemented |
TT0005 # 08 Y:2007 | 08 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $47,304 | $2,000 | Implemented |
LM0125 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,003 | $2,604 | Implemented |
LM0125 # 03 Y:2007 | 03 | 2007 | INSTALL EQUIPMENT TO MOVE PRODUCT | $89,704 | $11,000 | Implemented |
TA0126 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,070 | $3,858 | Implemented |