IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

319

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0506 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,579 $270 Implemented
WV0506 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $7,450 Implemented
WV0506 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,853 $7,076 Implemented
WV0504 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $293 $69 Implemented
WV0504 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $1,537 $556 Implemented
WV0504 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,334 $486 Implemented
WV0504 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,624 $12 Implemented
WV0504 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,984 $500 Implemented
WV0504 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,645 $15,271 Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented
WV0496 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $23,310 $0 Implemented
WV0496 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,258 $1,700 Implemented
WV0496 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,669 $1,000 Implemented
WV0496 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,604 $0 Implemented
WV0496 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $2,182 $976 Implemented
WV0496 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,130 $680 Implemented
UA0115 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,820 $800 Implemented
UA0115 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,145 $2,595 Implemented
UA0115 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,192 $1,920 Implemented
UK1313 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
UK1313 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UK1313 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $252,538 $210,000 Implemented
UK1313 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $3,770 $9,750 Implemented
UK1313 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,092 $0 Implemented
UK1313 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $15,000 Implemented