Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsNAICS | 331314 | Secondary Smelting and Alloying of Aluminum |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0378 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $2,693 | $3,996 | Implemented |
UM0378 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,490 | $31,638 | Implemented |
NC0392 # 01 Y:2009 | 01 | 2009 | INSTALL EQUIPMENT TO MOVE PRODUCT | $21,004 | $50,000 | Implemented |
NC0392 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $315 | $100 | Implemented |
NC0392 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,657 | $33,097 | Implemented |
NC0392 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $577 | Implemented |
UD0774 # 11 Y:2008 | 11 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,078 | $0 | Implemented |
UD0774 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $94,656 | $6,000 | Implemented |
UD0774 # 03 Y:2008 | 03 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $83,440 | $5,000 | Implemented |
UD0774 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,705 | $3,275 | Implemented |
UD0774 # 06 Y:2008 | 06 | 2008 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $9,454 | $0 | Implemented |
UD0774 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $2,250 | Implemented |
LE0261 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,476 | $150 | Implemented |
LE0261 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,155 | $1,500 | Implemented |
LE0261 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $100 | Implemented |
LE0261 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,461 | $20 | Implemented |
LM0125 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,003 | $2,604 | Implemented |
LM0125 # 03 Y:2007 | 03 | 2007 | INSTALL EQUIPMENT TO MOVE PRODUCT | $89,704 | $11,000 | Implemented |
UM0305 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,248 | $75 | Implemented |
UM0305 # 07 Y:2006 | 07 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,689 | $4,660 | Implemented |
UM0305 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $26,404 | $1,300 | Implemented |
UM0305 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $17,877 | $1,112 | Implemented |
UM0305 # 05 Y:2006 | 05 | 2006 | USE OPTIMUM THICKNESS INSULATION | $12,021 | $4,834 | Implemented |
UM0305 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,329 | $4,720 | Implemented |
LE0235 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,006 | $1,000 | Implemented |