IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
NAICS 331523 Nonferrous Metal Die-Casting Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 Implemented
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 Implemented
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 Implemented
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 Implemented
LE0467 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $825 $70 Implemented
LE0467 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,568 $30,054 Implemented
LE0467 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,990 $2,000 Implemented
LE0467 # 08 Y:2019 08 2019 UPGRADE OBSOLETE EQUIPMENT $500 $5,000 Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
MZ0254 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,499 $52,000 Implemented
MZ0254 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,370 $57,615 Implemented
MZ0254 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $384 $1,000 Implemented
MZ0254 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,434 $10,000 Implemented
MZ0254 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,856 $10,840 Implemented
MZ0254 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,653 $180 Implemented
MZ0254 # 02 Y:2018 02 2018 USE OPTIMUM THICKNESS INSULATION $49,702 $20,960 Implemented
WM0110 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,832 $23,000 Implemented
WM0110 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $38,561 $90,000 Implemented
TT0191 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,453 $8,274 Implemented
TT0191 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,156 $94,000 Implemented
TT0191 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,175 $250 Implemented
IA0563 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $570 $2,800 Implemented
IA0563 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,484 $700 Implemented
IA0563 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,182 $1,900 Implemented