Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
207
matching recommendationsNAICS | 331523 | Nonferrous Metal Die-Casting Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0295 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $0 | Implemented |
WV0295 # 14 Y:2004 | 14 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $245 | $165 | Implemented |
OK0688 # 02 Y:2004 | 02 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,034 | $2,400 | Implemented |
OK0688 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $7,575 | $3,782 | Implemented |
OK0688 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,211 | $535 | Implemented |
OK0688 # 05 Y:2004 | 05 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,882 | $3,690 | Implemented |
OK0688 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $1,846 | Implemented |
MA0549 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $32,668 | $15,495 | Implemented |
MA0549 # 04 Y:2004 | 04 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,653 | $16,100 | Implemented |
MA0549 # 06 Y:2004 | 06 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,412 | $0 | Implemented |
MA0549 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,794 | $315 | Implemented |
MA0549 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,041 | $896 | Implemented |
MA0549 # 09 Y:2004 | 09 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,021 | $1,100 | Implemented |
MA0549 # 11 Y:2004 | 11 | 2004 | DISCONNECT BALLASTS | $197 | $60 | Implemented |
LM0068 # 05 Y:2004 | 05 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,181 | $260 | Implemented |
LM0068 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,489 | $368 | Implemented |
IA0327 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,481 | $809 | Implemented |
IA0327 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,928 | $104 | Implemented |
IA0327 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $994 | $303 | Implemented |
IA0327 # 07 Y:2003 | 07 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,163 | $500 | Implemented |
IA0321 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,324 | $217 | Implemented |
IA0321 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,638 | $658 | Implemented |
IA0321 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $2,359 | $5,925 | Implemented |
UM0235 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,576 | $9,600 | Implemented |
UM0235 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,415 | $675 | Implemented |