Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,503
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0062 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,836 | $10,000 | Implemented |
MZ0062 # 13 Y:2011 | 13 | 2011 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $91 | $300 | Implemented |
MZ0062 # 14 Y:2011 | 14 | 2011 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,657 | $150,000 | Implemented |
MZ0062 # 16 Y:2011 | 16 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $11,500 | $18,000 | Implemented |
UD0827 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $995 | $500 | Implemented |
UD0827 # 07 Y:2010 | 07 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $597 | $50 | Implemented |
AM0586 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,790 | $3,000 | Implemented |
AM0586 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $13,725 | $0 | Implemented |
LL0340 # 01 Y:2010 | 01 | 2010 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $13,551 | $1,457 | Implemented |
LL0340 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,760 | $1,600 | Implemented |
LL0340 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $4,851 | $210 | Implemented |
LL0340 # 05 Y:2010 | 05 | 2010 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,310 | $420 | Implemented |
LL0340 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,383 | $8 | Implemented |
LL0340 # 09 Y:2010 | 09 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $356 | $425 | Implemented |
UD0826 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,622 | $2,500 | Implemented |
UD0826 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,036 | $2,500 | Implemented |
UD0826 # 03 Y:2010 | 03 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $978 | $60 | Implemented |
UD0826 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,213 | $35,000 | Implemented |
UD0826 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $788 | $2,200 | Implemented |
UD0826 # 09 Y:2010 | 09 | 2010 | INSULATE BARE EQUIPMENT | $5,734 | $1,600 | Implemented |
UM0376 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $36,732 | Implemented |
UM0376 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $7,625 | $250 | Implemented |
UM0376 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,381 | $9,416 | Implemented |
UM0376 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $6,547 | Implemented |
UM0376 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,793 | $200 | Implemented |