Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0243 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $0 | Implemented |
BD0243 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,799 | $1,965 | Implemented |
BD0243 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,415 | $1,200 | Implemented |
BD0243 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $13,962 | $8,250 | Implemented |
BD0243 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,406 | $1,000 | Implemented |
BD0243 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,277 | $2,030 | Implemented |
MI0066 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $217 | $220 | Implemented |
MI0066 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $729 | $33 | Implemented |
MI0066 # 05 Y:2003 | 05 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,238 | $60 | Implemented |
MI0066 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $800 | $536 | Implemented |
SU0166 # 03 Y:2003 | 03 | 2003 | $28,125 | $10,016 | Implemented | |
SU0166 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,000 | $68,560 | Implemented |
LE0170 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $367 | $0 | Implemented |
LE0170 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $952 | $0 | Implemented |
LE0170 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,647 | $7,000 | Implemented |
UU0053 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,869 | $2,340 | Implemented |
SU0165 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,370 | $17,064 | Implemented |
SU0165 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,503 | $937 | Implemented |
SU0165 # 07 Y:2003 | 07 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $93,620 | $94,691 | Implemented |
SU0165 # 01 Y:2003 | 01 | 2003 | $99,450 | $110,400 | Implemented | |
SU0165 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE SPENT ACID BATHS | $30,138 | $3,234 | Implemented |
MS0233 # 07 Y:2003 | 07 | 2003 | USE SYNTHETIC LUBRICANT | $3,787 | $1,210 | Implemented |
MS0233 # 01 Y:2003 | 01 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $200,928 | $9,650 | Implemented |
MS0233 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,274 | $21,420 | Implemented |
MS0233 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,291 | $36,800 | Implemented |