IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0547 # 04 Y:2004 04 2004 COVER OPEN TANKS $1,200 $750 Implemented
CO0547 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $880 $240 Implemented
CO0547 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $300 $420 Implemented
MI0082 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $10,385 $2,300 Implemented
MI0082 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $2,670 Implemented
MS0252 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $11,496 Implemented
MS0252 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,256 $230 Implemented
MS0252 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,270 $1,731 Implemented
MS0252 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $125 Implemented
GT0784 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,866 $1,000 Implemented
GT0784 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,500 $1,200 Implemented
GT0784 # 07 Y:2004 07 2004 MINIMIZE WATER USAGE $7,400 $1,840 Implemented
GT0784 # 08 Y:2004 08 2004 METER WASTE WATER $4,010 $1,100 Implemented
LE0187 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,995 $500 Implemented
LE0187 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $921 $500 Implemented
UD0697 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,804 $0 Implemented
UD0697 # 02 Y:2004 02 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,330 $0 Implemented
UD0697 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $2,950 $0 Implemented
UD0697 # 11 Y:2004 11 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $782 $0 Implemented
UD0697 # 12 Y:2004 12 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $244 $0 Implemented
UD0697 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $240 $91 Implemented
BD0261 # 01 Y:2004 01 2004 USE PHOTOCELL CONTROLS $2,004 $1,500 Implemented
BD0261 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,039 $400 Implemented
BD0261 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $586 $150 Implemented
BD0261 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Implemented