IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0766 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,352 $0 Implemented
OR0766 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,610 $0 Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0677 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,064 $658 Implemented
OR0677 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,372 $5,408 Implemented
OR0646 # 01 Y:2015 01 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $80,430 $5,071 Implemented
OR0646 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,468 $24,468 Implemented
OR0646 # 05 Y:2015 05 2015 ISOLATE HOT OR COLD EQUIPMENT $44,385 $3,000 Implemented
OR0527 # 06 Y:2008 06 2008 $3,600 $0 Implemented
OR0527 # 05 Y:2008 05 2008 $3,770 $3,770 Implemented
OR0527 # 04 Y:2008 04 2008 $3,900 $90 Implemented
OR0454 # 04 Y:2004 04 2004 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $16,940 $29,200 Implemented
OR0454 # 03 Y:2004 03 2004 $5,720 $13,080 Implemented
OR0434 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,850 $8,350 Implemented
OR0434 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $12,600 $5,000 Implemented