IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0662 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,172 $700 Implemented
WV0662 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $10,521 Implemented
WV0662 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $750 Implemented
WV0662 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,490 $392 Implemented
WV0662 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $3,117 $2,250 Implemented
WV0662 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $8,386 $5,500 Implemented
WV0662 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $945 Implemented
WV0662 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,538 $6,417 Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
WV0616 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $412 $25 Implemented
WV0616 # 10 Y:2021 10 2021 DEVELOP A REPAIR/REPLACE POLICY $173 $594 Implemented
WV0616 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $2,901 $1,650 Implemented
WV0616 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,963 $542 Implemented
WV0616 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,079 $2,877 Implemented
WV0616 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,796 $399 Implemented
WM0139 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,399 $2,250 Implemented
MA0797 # 04 Y:2019 04 2019 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,739 $3,000 Implemented
UA0199 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $919 Implemented
UA0199 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,877 $13,552 Implemented
UA0199 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,483 $9,013 Implemented
UA0199 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $698 Implemented
WV0553 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $128 $594 Implemented
WV0553 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,017 $210 Implemented