IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0626 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $250 $15 Implemented
IA0486 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $415 $350 Implemented
IA0486 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $362 $420 Implemented
IA0486 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $448 Implemented
IA0486 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,985 $8,186 Implemented
UM0399 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $5,760 $200 Implemented
UM0399 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,275 $1,300 Implemented
UM0399 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 Implemented
UM0399 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,480 $3,200 Implemented
UM0399 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $15,800 Implemented
UM0399 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $11,000 $10,000 Implemented
WV0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,236 $60,550 Implemented
WV0428 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $11,317 $815 Implemented
WV0428 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,763 $1,000 Implemented
WV0428 # 09 Y:2011 09 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,253 $2,000 Implemented
WV0428 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,120 $700 Implemented
WV0428 # 14 Y:2011 14 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,082 $600 Implemented
WV0428 # 15 Y:2011 15 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,154 $25 Implemented
MZ0063 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $480 Implemented
MZ0063 # 02 Y:2011 02 2011 ADJUST VENTS TO MINIMIZE ENERGY USE $1,007 $240 Implemented
MZ0063 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $886 $3,000 Implemented
MZ0063 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,168 $1,200 Implemented
MZ0063 # 06 Y:2011 06 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,235 $2,700 Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented