Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0574 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,969 | $45,000 | Implemented |
LE0574 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,332 | $69,375 | Implemented |
LE0574 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,430 | $5,760 | Implemented |
LE0574 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $11,872 | $2,400 | Implemented |
LE0448 # 01 Y:2018 | 01 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $2,899 | $25 | Implemented |
LE0448 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,450 | $25 | Implemented |
LE0448 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,660 | $5,250 | Implemented |
LE0448 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,721 | $11,738 | Implemented |
LE0448 # 08 Y:2018 | 08 | 2018 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,258 | $30,000 | Implemented |
LE0448 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $843 | $4,225 | Implemented |
LE0407 # 02 Y:2016 | 02 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,792 | $25 | Implemented |
LE0352 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,414 | $2,750 | Implemented |
LE0344 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $40 | Implemented |
LE0344 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,371 | $375 | Implemented |
WV0413 # 11 Y:2010 | 11 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,414 | $0 | Implemented |
WV0413 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,242 | $16,759 | Implemented |
WV0413 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,830 | $6,571 | Implemented |
WV0413 # 15 Y:2010 | 15 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,069 | $1,000 | Implemented |
WV0413 # 16 Y:2010 | 16 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $288 | $357 | Implemented |
WV0413 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $10,138 | $1,674 | Implemented |
WV0413 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $14,418 | $0 | Implemented |
WV0413 # 06 Y:2010 | 06 | 2010 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $24,889 | $9,534 | Implemented |
WV0413 # 04 Y:2010 | 04 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,435 | $55,000 | Implemented |
WV0413 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77,291 | $154,121 | Implemented |
LE0288 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,989 | $2,500 | Implemented |