IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

297

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0722 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,230 $1,000 Implemented
AM0722 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
AM0722 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149,000 $471,100 Implemented
NC0562 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,108 $100 Implemented
NC0562 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,093 $200 Implemented
SD0522 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,917 $200 Implemented
SD0522 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,109 $1,101 Implemented
SD0522 # 05 Y:2016 05 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,454 $1,725 Implemented
SD0522 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,341 $22,524 Implemented
SD0522 # 01 Y:2016 01 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $96,572 $386,410 Implemented
BD0474 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,050 $2,475 Implemented
BD0474 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $425 Implemented
BD0474 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $563 Implemented
BD0474 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,746 $400 Implemented
BD0474 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,083 $2,300 Implemented
MI0286 # 01 Y:2015 01 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $19,094 $29,862 Implemented
MI0286 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $14,710 $100,350 Implemented
MI0285 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,640 $52,920 Implemented
MI0285 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $80 Implemented
MI0285 # 04 Y:2015 04 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $13,892 $76,650 Implemented
MI0284 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $28,449 $55,650 Implemented
MI0284 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $77,529 $180,000 Implemented
MI0284 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,198 $6,520 Implemented
MI0284 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,415 $160 Implemented
MI0284 # 07 Y:2015 07 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,588 $2,527 Implemented