ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1019 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,684 | $0 | Implemented |
UD1019 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,619 | $82,620 | Implemented |
IP0118 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,954 | $824 | Implemented |
IP0118 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,154 | $1,526 | Implemented |
IP0118 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,021 | $10,215 | Implemented |
UD0833 # 15 Y:2011 | 15 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,435 | $100 | Implemented |
UD0833 # 12 Y:2011 | 12 | 2011 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $37,935 | $100 | Implemented |
UD0833 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $844 | $50 | Implemented |
UD0833 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,343 | $500 | Implemented |
UD0833 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,467 | $25 | Implemented |
UD0833 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $2,272 | $300 | Implemented |
NC0389 # 05 Y:2009 | 05 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $571 | $892 | Implemented |
NC0389 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $387 | $100 | Implemented |
MI0096 # 07 Y:2004 | 07 | 2004 | COVER OPEN TANKS | $34 | $25 | Implemented |
MI0096 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $56 | Implemented |
MI0096 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,619 | $150 | Implemented |
MI0096 # 02 Y:2004 | 02 | 2004 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $3,213 | $1,250 | Implemented |
CO0526 # 01 Y:2003 | 01 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $21,790 | $37,580 | Implemented |
CO0526 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $980 | $3,300 | Implemented |
CO0526 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,602 | $5,670 | Implemented |
CO0526 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,180 | $3,150 | Implemented |
CO0526 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,240 | $33,710 | Implemented |
SU0155 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,787 | $1,200 | Implemented |
SU0155 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,056 | $0 | Implemented |
SU0155 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,016 | $0 | Implemented |