IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 33341 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0674 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $715 $0 Implemented
UD0674 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $2,200 Implemented
UD0674 # 12 Y:2003 12 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $0 Implemented
UD0674 # 14 Y:2003 14 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $100 Implemented
UD0674 # 15 Y:2003 15 2003 DISCONNECT BALLASTS $313 $44 Implemented
UD0674 # 02 Y:2003 02 2003 $8,166 $30,000 Implemented
LM0062 # 10 Y:2003 10 2003 $105,000 $17,500 Implemented
LM0062 # 12 Y:2003 12 2003 $505,164 $0 Implemented
LM0062 # 11 Y:2003 11 2003 $17,820 $3,000 Implemented
LM0062 # 09 Y:2003 09 2003 $52,500 $19,910 Implemented
LM0062 # 08 Y:2003 08 2003 AIR CONDITION ONLY SPACE NECESSARY $17,255 $0 Implemented
LM0062 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,369 $410 Implemented
LM0062 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $415 $219 Implemented
LM0062 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $711 $724 Implemented
LM0062 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,246 $0 Implemented
LM0062 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,003 $6,290 Implemented
OK0661 # 02 Y:2003 02 2003 $20,400 $0 Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 08 Y:2003 08 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,061 $45,000 Implemented
OK0661 # 09 Y:2003 09 2003 $11,440 $2,500 Implemented
SU0161 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $12,003 $16,100 Implemented
SU0161 # 02 Y:2003 02 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $1,035 $540 Implemented
MS0221 # 01 Y:2003 01 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $202,950 $8,100 Implemented
MS0221 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,834 $782 Implemented
SU0153 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,642 $93,355 Implemented