Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
400
matching recommendationsNAICS | 3335 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0142 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,435 | $31,000 | Implemented |
MA0728 # 01 Y:2014 | 01 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,512 | $25,775 | Implemented |
MA0728 # 02 Y:2014 | 02 | 2014 | REPLACE BOILER | $10,114 | $30,450 | Implemented |
MA0728 # 03 Y:2014 | 03 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,940 | $6,500 | Implemented |
BD0439 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $6,296 | $50 | Implemented |
BD0439 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,900 | $1,000 | Implemented |
BD0439 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $813 | $795 | Implemented |
BD0439 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $20 | Implemented |
BD0439 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $341 | $350 | Implemented |
UM0437 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,350 | $4,000 | Implemented |
UM0437 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,700 | $5,700 | Implemented |
UM0437 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,430 | $510 | Implemented |
BS0018 # 01 Y:2013 | 01 | 2013 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $552 | $934 | Implemented |
BS0018 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,122 | $7,317 | Implemented |
BS0018 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $152 | $600 | Implemented |
TT0103 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,502 | $0 | Implemented |
TT0103 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,318 | $5,300 | Implemented |
WM0011 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,000 | $0 | Implemented |
WM0011 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,063 | $440 | Implemented |
WM0011 # 03 Y:2012 | 03 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $293 | $265 | Implemented |
WM0011 # 09 Y:2012 | 09 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $2,993 | $3,000 | Implemented |
MAS029 # 01 Y:2012 | 01 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,149 | $500 | Implemented |
MAS029 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,313 | $4,270 | Implemented |
MAS029 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,392 | $0 | Implemented |
AM0608 # 01 Y:2012 | 01 | 2012 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,383,679 | $251,064 | Implemented |