Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 333618 | Other Engine Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0412 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,397 | $8,050 | Implemented |
LE0412 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,688 | $19,250 | Implemented |
LE0412 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $462 | $1,382 | Implemented |
LE0412 # 07 Y:2016 | 07 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,939 | $35,720 | Implemented |
TT0149 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $247 | $1,200 | Implemented |
TT0149 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $384 | $804 | Implemented |
TT0149 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,606 | $2,440 | Implemented |
TT0149 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,084 | $3,000 | Implemented |
TT0149 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,830 | $1,514 | Implemented |
MZ0113 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,620 | $900 | Implemented |
MZ0113 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,414 | $8,758 | Implemented |
MZ0113 # 03 Y:2013 | 03 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $7,609 | $1,000 | Implemented |
MZ0113 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,882 | $1,698 | Implemented |
MZ0113 # 05 Y:2013 | 05 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,613 | $4,973 | Implemented |
MZ0113 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $3,575 | $3,500 | Implemented |
MZ0113 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $1,050 | Implemented |
MZ0113 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $620 | Implemented |
MZ0113 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $545 | $902 | Implemented |
MZ0113 # 07 Y:2013 | 07 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,948 | $50 | Implemented |
MZ0097 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,305 | $35,000 | Implemented |
MZ0097 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,968 | $450 | Implemented |
LL0314 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $770 | Implemented |
LL0314 # 04 Y:2009 | 04 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,010 | $1,350 | Implemented |
LL0314 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $74,110 | $7,510 | Implemented |
LL0314 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149,374 | $64,560 | Implemented |