IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
NAICS 333924 Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0441 # 08 Y:2014 08 2014 CHANGE OPERATING CONDITIONS $1,402 $30 Implemented
UA0054 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $4,372 $3,230 Implemented
UA0054 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,010 $7,000 Implemented
MS0298 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,739 $1,313 Implemented
MS0298 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,600 $53,730 Implemented
MS0298 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,377 $17,617 Implemented
MS0298 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,964 $236 Implemented
MS0298 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,852 $2,775 Implemented
IA0352 # 05 Y:2004 05 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $12,016 $2 Implemented
IA0352 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,245 $6 Implemented
IA0352 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $136 Implemented
IA0352 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $6,618 Implemented
IA0352 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $867,815 $171 Implemented
IA0352 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $416 Implemented
IA0352 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,699 $3,750 Implemented
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented
IA0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,846 $446 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 07 Y:2004 07 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,733 $10,000 Implemented
NC0286 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $247 $191 Implemented
NC0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $175 $169 Implemented
NC0286 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $1,892 $2,000 Implemented
NC0286 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,904 $100 Implemented
NC0286 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $12,177 $35,730 Implemented
UD0676 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $19,216 $6,000 Implemented