IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 334413 Semiconductor and Related Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0445 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $118 $500 Implemented
SU0349 # 01 Y:2013 01 2013 PAY BILLS ON TIME TO AVOID LATE FEES $6,610 $0 Implemented
SU0349 # 08 Y:2013 08 2013 UPGRADE OBSOLETE EQUIPMENT $3,201 $8,460 Implemented
AM0621 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,750 $11,600 Implemented
AM0621 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $1,000 Implemented
CO0626 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,520 $7,500 Implemented
MA0640 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $36,692 $39,000 Implemented
MA0640 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $11,811 $11,850 Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
LE0240 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $265,405 $500,000 Implemented
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
WV0344 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $50,956 $1,472 Implemented
WV0344 # 02 Y:2006 02 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $41,030 $1,000 Implemented
WV0344 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,182 $27,387 Implemented
WV0344 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $18,000 $32,500 Implemented
WV0344 # 06 Y:2006 06 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,147 $26,662 Implemented