Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsNAICS | 334413 | Semiconductor and Related Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0905 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,682 | $0 | Implemented |
UD0905 # 04 Y:2014 | 04 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,046 | $0 | Implemented |
UD0905 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,533 | $188,160 | Implemented |
UM0445 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $118 | $500 | Implemented |
SU0349 # 01 Y:2013 | 01 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,610 | $0 | Implemented |
SU0349 # 08 Y:2013 | 08 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $3,201 | $8,460 | Implemented |
AM0621 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,750 | $11,600 | Implemented |
AM0621 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,680 | $1,000 | Implemented |
CO0626 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,520 | $7,500 | Implemented |
MA0640 # 01 Y:2008 | 01 | 2008 | REDUCE VENTILATION AIR | $36,692 | $39,000 | Implemented |
MA0640 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,811 | $11,850 | Implemented |
MA0640 # 05 Y:2008 | 05 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | Implemented |
MA0640 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |
MA0640 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $689 | Implemented |
LE0254 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,686 | $20,000 | Implemented |
LE0254 # 06 Y:2007 | 06 | 2007 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $5,988 | $3,000 | Implemented |
LE0240 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $265,405 | $500,000 | Implemented |
LE0240 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,974 | $2,092 | Implemented |
LE0240 # 04 Y:2006 | 04 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,308 | $2,500 | Implemented |
LE0240 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,178 | $4,500 | Implemented |
LE0240 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,994 | $500 | Implemented |
LE0240 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $331 | $300 | Implemented |
LE0240 # 08 Y:2006 | 08 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $192 | $300 | Implemented |
WV0344 # 01 Y:2006 | 01 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $50,956 | $1,472 | Implemented |
WV0344 # 02 Y:2006 | 02 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $41,030 | $1,000 | Implemented |