Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0781 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $285 | $215 | Implemented |
MA0781 # 04 Y:2017 | 04 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,734 | $2,724 | Implemented |
MA0767 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $361 | $274 | Implemented |
MA0767 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $7,620 | $3,955 | Implemented |
MA0767 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $911 | $3,330 | Implemented |
MA0767 # 05 Y:2016 | 05 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $461 | $157 | Implemented |
MA0744 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $8,840 | $12,155 | Implemented |
MA0744 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,325 | $1,800 | Implemented |
MA0740 # 02 Y:2015 | 02 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,057 | $4,200 | Implemented |
MA0740 # 05 Y:2015 | 05 | 2015 | REDUCE VENTILATION AIR | $3,084 | $2,450 | Implemented |
MA0740 # 01 Y:2015 | 01 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $18,853 | $200 | Implemented |
MA0740 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $426 | $500 | Implemented |
MA0740 # 03 Y:2015 | 03 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,672 | $11,200 | Implemented |
MA0740 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,745 | $6,695 | Implemented |
MA0740 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,904 | $1,425 | Implemented |
MA0740 # 08 Y:2015 | 08 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,775 | $2,010 | Implemented |
MA0737 # 01 Y:2014 | 01 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,551 | $200 | Implemented |
MA0737 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,120 | $8,225 | Implemented |
MA0737 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $551 | $1,688 | Implemented |
MA0721 # 02 Y:2013 | 02 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,906 | $7,500 | Implemented |
MA0721 # 03 Y:2013 | 03 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,493 | $11,000 | Implemented |
MA0721 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,864 | $200 | Implemented |
MA0721 # 05 Y:2013 | 05 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,474 | $200 | Implemented |
MA0721 # 06 Y:2013 | 06 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $2,358 | $1,120 | Implemented |
MA0721 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,130 | $1,020 | Implemented |