Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143
matching recommendationsNAICS | 3361 | Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0620 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,233 | $660 | Implemented |
WV0620 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,394 | $7,905 | Implemented |
WV0620 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,785 | $7,090 | Implemented |
UF0572 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,414 | $756 | Implemented |
UF0572 # 08 Y:2022 | 08 | 2022 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,635 | $4,650 | Implemented |
UF0572 # 07 Y:2022 | 07 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,245 | $11,975 | Implemented |
UF0572 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,152 | $3,218 | Implemented |
UF0572 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $27,950 | $26,859 | Implemented |
UF0572 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,159 | $10,627 | Implemented |
UF0572 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,857 | $359,360 | Implemented |
UF0572 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $4,007 | $8,760 | Implemented |
IP0150 # 01 Y:2021 | 01 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $952 | $0 | Implemented |
IP0150 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $150 | Implemented |
IP0150 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $357 | $9 | Implemented |
IP0150 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $423 | $42 | Implemented |
IP0150 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $654 | $1,559 | Implemented |
NC0655 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $310 | $500 | Implemented |
UA0235 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,137 | $81 | Implemented |
UA0235 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,979 | $2,094 | Implemented |
UA0235 # 04 Y:2021 | 04 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,001 | $808 | Implemented |
UA0235 # 05 Y:2021 | 05 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $26,697 | $150 | Implemented |
TT0212 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,776 | $32,000 | Implemented |
TT0212 # 04 Y:2018 | 04 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $38,635 | $13,000 | Implemented |
TT0212 # 05 Y:2018 | 05 | 2018 | METER WASTE WATER | $34,128 | $1,900 | Implemented |
TT0212 # 09 Y:2018 | 09 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,775 | $5,000 | Implemented |