IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
NAICS 336211 Motor Vehicle Body Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0309 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $653 $1,200 Implemented
BD0309 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $475 Implemented
BD0308 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $55,089 $7,500 Implemented
BD0308 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,718 $15,000 Implemented
BD0308 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $47,488 $24,000 Implemented
BD0308 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,806 $30,100 Implemented
BD0308 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,996 $1,500 Implemented
BD0308 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,394 $1,275 Implemented
BD0308 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $161 $160 Implemented
BD0308 # 08 Y:2006 08 2006 MINIMIZE WATER USAGE $254 $1,150 Implemented
UD0737 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $448,000 $-70,000 Implemented
UD0737 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $6,552 Implemented
IA0367 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $52 Implemented
IA0367 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $200 Implemented
IA0367 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $1,080 Implemented
IA0367 # 04 Y:2005 04 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $9,149 $0 Implemented
IA0367 # 05 Y:2005 05 2005 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $20,800 $1,046 Implemented
IA0367 # 06 Y:2005 06 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,840 Implemented
IA0367 # 07 Y:2005 07 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,270 Implemented
UM0281 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,337 $300 Implemented
UM0281 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,591 $3,891 Implemented
UM0281 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,961 $75 Implemented
UM0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $75 Implemented
UM0281 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $125 $100 Implemented
GT0794 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $2,046 Implemented