IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0493 # 02 Y:2016 02 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,064 $1,350 Implemented
SF0493 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $81,971 $0 Implemented
UD0936 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,521 $1,000 Implemented
UD0936 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $1,480 Implemented
UD0936 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,271 $85,000 Implemented
UD0936 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,431 $2,260 Implemented
UD0936 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,695 $0 Implemented
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,078 $68,997 Implemented
NC0543 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,402 $100 Implemented
NC0543 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,805 $100 Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
MZ0161 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,710 $12,000 Implemented
MA0726 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $608 $500 Implemented
UA3024 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,436 $2,500 Implemented
IA0475 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,055 $1,160 Implemented
IA0475 # 02 Y:2012 02 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $1,377 $235 Implemented
IA0475 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $960 $433 Implemented
UA0059 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,648 $2,500 Implemented
UA0059 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,193 $640 Implemented
UD0835 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $25 Implemented
IA0418 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $244 Implemented
IA0418 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,360 $1,100 Implemented
IA0418 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,001 $788 Implemented
IA0418 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $24 Implemented