IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
NAICS 336360 Motor Vehicle Seating and Interior Trim Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
UA0258 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,159 $787 Implemented
UA0258 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $1,756 $3,299 Implemented
UA0258 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,172 $1,000 Implemented
UA0258 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,324 $2,000 Implemented
TR0021 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $35,728 $7,275 Implemented
TR0021 # 03 Y:2020 03 2020 USE MECHANICAL STRIPPING METHODS $2,731 $666 Implemented
TT0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,494 $3,750 Implemented
TT0216 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $1,530 Implemented
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented
TT0216 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,220 $20 Implemented
TT0216 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $1,710 Implemented
TT0216 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $14,507 $20,000 Implemented
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
NC0623 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $2,320 $1,203 Implemented
NC0623 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $900 Implemented
NC0623 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $500 Implemented
TR0003 # 07 Y:2017 07 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,954 $10,000 Implemented
TR0003 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,044 $64,592 Implemented
TR0003 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,843 $2,000 Implemented
TR0003 # 04 Y:2017 04 2017 APPLY FOR INVESTMENT INCENTIVES $74,012 $15,000 Implemented
TR0003 # 05 Y:2017 05 2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $24,242 $38,964 Implemented
IC0195 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,417 $5,650 Implemented