IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 336370 Motor Vehicle Metal Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $27,897 $0 Implemented
UD1049 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115,254 $300,000 Implemented
WV0520 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $780 $1,156 Implemented
WV0520 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,809 $1,589 Implemented
WV0520 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,037 $370 Implemented
WV0520 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $384 Implemented
WV0520 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $461 $428 Implemented
WV0511 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,254 $2,007 Implemented
WV0511 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,417 $15,818 Implemented
WV0511 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,476 $0 Implemented
WV0511 # 10 Y:2015 10 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,475 $618 Implemented
WV0511 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $1,478 $677 Implemented
WV0511 # 13 Y:2015 13 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $500 $1,000 Implemented
WV0511 # 12 Y:2015 12 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $30 Implemented
UD0920 # 12 Y:2015 12 2015 CONVERT TO AQUEOUS CLEANING SYSTEM $6,095 $7,375 Implemented
UD0920 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $13,359 $0 Implemented
UD0889 # 02 Y:2013 02 2013 DEVELOP A REPAIR/REPLACE POLICY $654 $460 Implemented
UD0889 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,100 $0 Implemented
WV0415 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $4,490 Implemented
WV0415 # 12 Y:2010 12 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,032 $1,312 Implemented
WV0415 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,852 $884 Implemented
WV0415 # 08 Y:2010 08 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,733 $700 Implemented
WV0415 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,621 $2,000 Implemented
WV0415 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,767 $1,503 Implemented