Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0426 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,797 | $5,872 | Implemented |
BD0426 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $400 | Implemented |
BD0426 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,240 | $20 | Implemented |
BD0408 # 06 Y:2012 | 06 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $975 | $400 | Implemented |
BD0408 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $154 | $20 | Implemented |
BD0408 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,622 | $4,000 | Implemented |
BD0408 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,937 | $1,500 | Implemented |
BD0392 # 12 Y:2011 | 12 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $12,800 | $1,600 | Implemented |
BD0392 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $419 | $10 | Implemented |
BD0392 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,781 | $3,500 | Implemented |
BD0392 # 03 Y:2011 | 03 | 2011 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $6,856 | $55,000 | Implemented |
BD0360 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,208 | $20,180 | Implemented |
BD0360 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,740 | $2,700 | Implemented |
BD0360 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,222 | $1,000 | Implemented |
IC0146 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $1,535 | $3,688 | Implemented |
IC0146 # 08 Y:2008 | 08 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $541 | $0 | Implemented |
IC0146 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $211 | Implemented |
IC0146 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,631 | $729 | Implemented |
IC0146 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $24,543 | $208,785 | Implemented |
IC0146 # 02 Y:2008 | 02 | 2008 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,159 | $0 | Implemented |
IC0146 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $487 | $424 | Implemented |
IC0146 # 11 Y:2008 | 11 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $679 | $0 | Implemented |
IC0116 # 05 Y:2006 | 05 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,114 | $0 | Implemented |
IC0116 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,603 | $6,000 | Implemented |
IC0116 # 04 Y:2006 | 04 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $15,127 | $218 | Implemented |