IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2217 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,163 $19,500 Implemented
UL2217 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,602 $50,000 Implemented
UL2217 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $32,626 $94,199 Implemented
UL2217 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,426 $0 Implemented
UL2217 # 09 Y:2022 09 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,279 $0 Implemented
UL2217 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,146 $30,000 Implemented
UD1030 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,026 $340 Implemented
UD1030 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,553 $21,607 Implemented
UD1030 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,340 $0 Implemented
UD1030 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $20,126 $28,000 Implemented
UD0963 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,139 $0 Implemented
UD0963 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,232 $400 Implemented
UD0959 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,991 $14,214 Implemented
UD0959 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,843 $0 Implemented
UD0959 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,881 $10,000 Implemented
UD0959 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $78 $0 Implemented
WV0500 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $4,647 Implemented
WV0500 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,981 $10,019 Implemented
WV0500 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,477 $0 Implemented
WV0500 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $516 $542 Implemented
WV0500 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,013 $20 Implemented
UD0914 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,276 $82,980 Implemented
UD0914 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,381 $0 Implemented
UD0907 # 08 Y:2014 08 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,440 $0 Implemented
UD0907 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $314 $500 Implemented