IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1091 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $2,210 $9,834 Implemented
OK1091 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,017 $630 Implemented
OK1091 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,533 $9,900 Implemented
OK1079 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $424 $318 Implemented
OK1079 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $824 $3,200 Implemented
OK1079 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $763 $10,500 Implemented
OK1079 # 03 Y:2023 03 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,711 $3,994 Implemented
OK1079 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,184 $0 Implemented
OK1079 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $800 $3,624 Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
OK1083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $2,799 Implemented
OK0994 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,575 $29,950 Implemented
OK0994 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,833 $8,422 Implemented
OK0994 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,051 $590 Implemented
OK0880 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,983 $61,440 Implemented
OK0832 # 09 Y:2012 09 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,579 $1,170 Implemented
OK0801 # 12 Y:2010 12 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,196 $21,075 Implemented
OK0801 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $995 $2,625 Implemented
OK0801 # 03 Y:2010 03 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $9,699 $3,000 Implemented
OK0801 # 02 Y:2010 02 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,599 $34,948 Implemented
OK0801 # 01 Y:2010 01 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,511 $78,169 Implemented
OK0790 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $13 Implemented
OK0790 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $20,203 Implemented
OK0790 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,871 $1,750 Implemented
OK0790 # 03 Y:2010 03 2010 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $32,076 $0 Implemented