IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

573

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0128 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $829 $0 Implemented
MI0324 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,637 $15,056 Implemented
MI0324 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $28,032 $41,300 Implemented
MI0324 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,387 $8,923 Implemented
MI0324 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,467 $4,900 Implemented
MI0324 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,663 $1,478 Implemented
MI0324 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,528 $1,000 Implemented
MI0324 # 10 Y:2017 10 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,051 $1,722 Implemented
NL0008 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,345 $0 Implemented
NL0008 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,330 $14,200 Implemented
NL0008 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $4,600 Implemented
MI0315 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,269 $1,660 Implemented
MI0315 # 02 Y:2017 02 2017 REPLACE BOILER $28,850 $36,000 Implemented
MI0315 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,687 $960 Implemented
MI0315 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $9,833 $434 Implemented
MI0315 # 07 Y:2017 07 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,476 $6,800 Implemented
MI0315 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,093 $5,340 Implemented
UU0118 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $7,381 $0 Implemented
SD0549 # 01 Y:2017 01 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,288 $204,000 Implemented
SD0549 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,056 $3,882 Implemented
SD0549 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $4,352 Implemented
SD0549 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $600 Implemented
SD0549 # 05 Y:2017 05 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $300 Implemented
UU0116 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,863 $0 Implemented
UU0116 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $2,402 Implemented