IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

573

matching recommendations
Reset
NAICS 33911 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0646 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $357 $407 Implemented
WV0646 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $8,960 $12,682 Implemented
WV0646 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,490 $301 Implemented
WV0646 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,436 $1,807 Implemented
WV0646 # 13 Y:2023 13 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $669 $1,895 Implemented
WV0646 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $3,094 $1,481 Implemented
WV0646 # 15 Y:2023 15 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $419 $909 Implemented
SD0638 # 11 Y:2023 11 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,174 $306 Implemented
SD0638 # 03 Y:2023 03 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $161 $250 Implemented
SD0638 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $500 Implemented
SD0638 # 13 Y:2023 13 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $98,322 $418,100 Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
UD1053 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $288,790 $110,000 Implemented
UF0589 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $920,434 $2,793,000 Implemented
UF0589 # 17 Y:2023 17 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $88,974 $10,000 Implemented
UF0589 # 16 Y:2023 16 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,322 $0 Implemented
UF0589 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,438 $0 Implemented
UF0589 # 08 Y:2023 08 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $13,274 $30,000 Implemented
UF0589 # 10 Y:2023 10 2023 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $5,304 $4,300 Implemented
UF0589 # 07 Y:2023 07 2023 CLEAN CONDENSER TUBES $15,589 $0 Implemented
UF0589 # 02 Y:2023 02 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $505,092 $2,115,660 Implemented
UF0589 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $71,810 $25,340 Implemented
UF0589 # 06 Y:2023 06 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $18,200 $14,400 Implemented
UF0589 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,787 $43,077 Implemented